05

Priority charging protocol for DC charging via CCS2

Contents
recommendation 05 visual
Summary

Priority charging protocol for DC charging via CCS2

ISO 15118-2 should be the default priority charging protocol, ISO15118-20 is ‘nice to have’.

As the transition to zero-emission construction sites accelerates, challenges related to reliable and intelligent charging are increasingly emerging on-site. Participants of the ENI/ElaadNL the OEM Roundtable are aligning on a unified message: ISO 15118-2 should be the default charging protocol for electric construction equipment to overcome these issues in the field. This standard meets current functional demands, enables smart charging, complies with EU cybersecurity requirements, and simplifies implementation compared to newer alternatives. The DIN 70121 charging protocol should not be prioritized.

The more advanced ISO 15118-20 charging protocol is seen as the logical next step for developments that are emerging. E.g. vehicle to grid functionality is expected to be utilized increasingly as construction equipment typically involves large battery capacity assets.

Download

05

Priority charging protocol for DC charging via CCS2

Endorse this recommendation if you find it value adding to the adoption of electric construction equipment.

Endorse

Question or input?

Get in touch if you want to learn more about this recommendation or contribute to future topics.

Contact OEM Roundtable

All recommendations

Practical recommendations for safer and more interoperable electric equipment

The OEM Roundtable publishes voluntary recommendations that help align the market on charging, safety, interfaces and user-friendliness.

View all recommendations

01

Provisions for professional first responders

Adequate information is recommended for all electric machinery and should follow the format described in the ISO 17840 standard.

Read more

02

Uniform light indicators of the charging process on the machine

Light indicators should signal the state of charging in different colours and frequencies. See the table for a uniform recommendation.

Read more

03

Location of the charging socket on the machine

The socket location on machines should be predictable, on the cabin entry side, to allow for charging infrastructure to suit all types of machines.

Read more

04

Big red buttons / Emergency stop buttons

An Emergency stop (E-stop) button specifically for charging should be located on the charger, not on the machine.

Read more

05

Priority charging protocol for DC charging via CCS2

ISO 15118-2 should be the default priority charging protocol, ISO15118-20 is ‘nice to have’.

Read more

06

Equipment specifications pre-purchase

Machine specifications for electric NRMM should feature these data fields in pre-purchase information.

Read more

07

Disclose ZE relevant telematics data fields with priority

Several ZE telematics data fields have an important use and should be made available with priority.

Read more